The Highpoint Plaza project began with a comprehensive site evaluation to understand the terrain, soil composition, and drainage patterns. Our team conducted a topographical survey and soil analysis to ensure the grading plan would support the heavy loads of the planned retail buildings. Collaborating with the site engineers, we developed a customized grading strategy that prioritized stability and proper water runoff.
Once the plan was finalized, our crew mobilized state-of-the-art equipment, including laser-guided graders and GPS technology, to begin leveling the land. This ensured the site’s elevation was consistent and aligned with the client’s specifications. Slopes were carefully created to guide water into pre-constructed drainage channels, preventing pooling and erosion. We also worked in stages to minimize disruption and maintain safety across the site.
After completing the grading process, our quality assurance team inspected the site to ensure every section met engineering standards. Using precision instruments, we verified the grading accuracy, especially in areas where future structures would be built. The project was delivered two weeks ahead of schedule, giving the construction team extra time to begin their work.